The Diadema Wind Park, comprising seven 0.9 MW Enercon E-44 wind turbines and a total installed capacity of 6.3 MW, is located approximately 20 km (12.43 mi) northwest of Comodoro Rivadavia City, Chubut Province, Argentina. The wind park started operations in December 2011.

Wind park
Net Annual Capacity Factor

  • Year 2013: 47.9%

  • Year 2014: 53.4%

  • Year 2015: 48.3%

  • Year 2016: 37.5%

  • Year 2017: 54.9%

World net capacity factor year 2013: 22.3%.
Source: Global World Energy Council - GWEC

Total Energy generated until Dec. 2017: 162027.4 MWh
Accumulated Capacity Factor until Dec. 2017: 48.9%

Hychico - Developing sustainable future from Patagonia Hychico - Developing sustainable future from Patagonia

Development of the wind park project, coupled with the technical assistance of well-known national and international companies and agencies, helped Hychico gain experience in the following fields:

  • Hychico - Desde Patagonia desarrollando el futuro sostenible

    Wind measurement audited by authorized companies

  • Hychico - Desde Patagonia desarrollando el futuro sostenible

    Selection of wind turbines suitable for the site

  • Hychico - Desde Patagonia desarrollando el futuro sostenible

    Location of each wind turbine in order to optimize operation

  • Hychico - Desde Patagonia desarrollando el futuro sostenible

    Civil and electrical works projects related to wind parks

  •  
  • Hychico - Desde Patagonia desarrollando el futuro sostenible

    Environmental impact assessment, including the impact on birds

  • Hychico - Desde Patagonia desarrollando el futuro sostenible

    Electrical assessments to obtain authorization for interconnection with the Wholesale Electric Market

  • Hychico - Desde Patagonia desarrollando el futuro sostenible

    Wind Park assembly and commissioning

Monthly mean wind speed 2016

9.3m/s annual

Hychico - Developing sustainable future from Patagonia Hychico - Developing sustainable future from Patagonia

In June 2012 Hychico certified its Environmental Management System for the Diadema Wind Park under IRAM-ISO 14001:2004 standard (IRAM: Argentine Materials Standardization Institute).